Technical survey and detection of existing defects and damages
Certified engineers assess structural elements, engineering equipment, utilities, efficiency of energy consumption.
Detecting discrepancies between executed works and acts of completion
Certified cost engineers and technical supervision engineers of CC2, CC3 levels perform cabinet and field analysis of works executed.
Detecting excess costs or materials over tilization rates
Certified cost engineers perform cabinet analysis of as-built and estimate documentation.
Determining actual quantities of construction and installation works
Field instrumental research of construction and installation works to identify actual quantities of works executed and compliance with quality requirements.
Calculating capital expenditures basing on market rates relevant in construction period
Alternative calculation of completed construction and assembly costs based on rates of contractors and suppliers of such works and materials effective during construction period.