Developing and implementing strategies for sophisticated projects

All project challenges are considered
  • Developing and implementing strategy for a sophisticated project

    Analysis of Client’s targets, requirements and limitations relating to existing context. Developing the most effective roadmap of project implementation, considering limitations, requirements and risks.

  • Analyzing and optimizing project schedule

    Developing project’s organizational breakdown structure, work breakdown structure.

  • Analysis of deadlines and budgets in order to optimize design solutions

    Reverse optimization of design solutions by analyzing schedules, budgets and existing deviations in works, equipment and materials.

  • Identifying and elaborating critical milestones to engage Client’s representative

    Conducting meetings with Client and ’Contractors in order to elaborate critical milestones in an optimal way.

  • Project controls with “critical path” method

    Using project management tool to identify and manage works directly affecting project deadlines.

  • Operational control over project implementation

    Point-to-point operational immersion into coordination of works and procurement processes. Reporting control.

  • Phase-Gate planning

    Identifying transition criteria and conducting phase-gate handover

  • Debriefings upon project completion

    Development of debriefing structure, participant requirements, data requirements for report and its presentation at debriefing session. Conducting debriefings and formalizing results.

Our projects

project

NEPTUNE grain terminal

Pivdennyi Sea Port, Odessa region
Customer:
MV Cargo
Role:
Project management for technical part of the project.
Result:
More than 600 contractors and suppliers, as well as more than 500 workers were involved at the peak of construction.
project

FORUM LVIV

Lviv city
Customer:
MULTI Development Ukraine LLC
Role:
Assessment and certification of FORUM LVIV shopping and entertainment center according to BREEAM International environmental standard.
Result:
FORUM LVIV became the first shopping and entertainment center in Ukraine certified according to the BREEAM International standard.
project

Rive Gauche shopping center and Retail Park Petrivka

Kyiv city
Customer:
IMMOCHAN
Role:
Coordinating tenant adaptation in 2 shopping centers.
Result:
Works performed by tenants were checked and ensured to comply with the requirements of the international developer’s project.
project

Fuel business of SCM Holding

Сustomer:
SCM (35 objects in Donetsk, Luhansk and Zaporizhzhia regions).
Role:
Construction audit and revealing potential corruption points. Optimising construction budget.
Result:
Saving 16% of construction budget and 17% in schedule.
project

Barabashovo market

Kharkiv city
Customer:
CONCERN AVEC AND CO
Role:
2017: technical audit of the shopping center. GBA: over 75 hectares. 2018-2019: survey of the capital costs of the shopping center with the formation of reports for financing organizations (banks).
Result:
2017: a large-scale audit was performed. 2018-2019: quarterly surveying of capital expenditures was carried out in accordance with the developed budget to eliminate the identified risks.
project

Multiplex сinema

Kyiv city
Customer:
Multiplex
Role:
Management of contract works during construction of cinema in Sky Mall shopping center.
Result:
Сonstruction of 10 cinema halls with full operational capability.
project

TIS

Odesa region
Customer:
TIS
Role:
Coordinating construction projects of railway defroster and “blue re-bar” warehouse.
Result:
2015-2017: the objects were put into operation according to the schedules and within the budget.
KEY Group in figures
0 years
in construction project management
$ 0
загальна вартість об’єктів
0 m 2
GBA
0
total number of workers during our assignments