hero-background-about hero-background-about

Project management according to EPCM scheme

Your project is implemented on time, within budget, transparently, safely and with high quality
  • Design management

    Studying project targets for development and approval of technical specifications. Coordinating design contractors from development of design documentation to final result.

  • Optimizing design documentation

    Analyzing design documentation, relevant standards and project targets for maximum cost-effectiveness of design solutions keeping quality, reliability and deadlines.

  • Coordinating contractors

    Organizing communications, works, document flow between contractors and project team’s services for maximum effectiveness and safest implementation of the project.

  • Technical supervision

    Controlling method and scope of works in accordance with design documentation.

  • Implementation of Environmental and Health Safety (EHS) system

    Development and implementation of procedures for training, control and supervision of environmental and health safety.

  • Legal support

    Preparing, approving, concluding contracts with contractors and suppliers for project implementation purposes. Support on permits.

  • Procurement

    Development, approval and processing of tender tasks, processing and analysis of tender proposals, negotiations for price reduction, contract tracking.

  • Analytical support/reporting

    Collecting, analysing and dashboarding project progress data, identification of critical aspects, recommendations for eliminating risks. Daily, weekly and monthly reporting.

  • Collecting and verifying as-built documentation

    Collecting, verifying, preparing comments on deviations, control of their elimination, preparing as-built documentation for handing over to ops team.

  • Checking and accepting completed works

    Checking results of completed works wiht instrumental or another type of inspection. Commissioning and startup tests for equipment and utilities.

  • Commissioning and handing over to ops team

    Obtaining certificate of conformity, necessary permits for start of operation, commissioning inspection and handing over as-built documentation package to ops team

Our projects

project

NEPTUNE grain terminal

Pivdennyi Sea Port, Odessa region
Customer:
MV Cargo
Role:
Project management for technical part of the project.
Result:
More than 600 contractors and suppliers, as well as more than 500 workers were involved at the peak of construction.
project

FORUM LVIV

Lviv city
Customer:
MULTI Development Ukraine LLC
Role:
Assessment and certification of FORUM LVIV shopping and entertainment center according to BREEAM International environmental standard.
Result:
FORUM LVIV became the first shopping and entertainment center in Ukraine certified according to the BREEAM International standard.
project

Rive Gauche shopping center and Retail Park Petrivka

Kyiv city
Customer:
IMMOCHAN
Role:
Coordinating tenant adaptation in 2 shopping centers.
Result:
Works performed by tenants were checked and ensured to comply with the requirements of the international developer’s project.
project

Fuel business of SCM Holding

Сustomer:
SCM (35 objects in Donetsk, Luhansk and Zaporizhzhia regions).
Role:
Construction audit and revealing potential corruption points. Optimising construction budget.
Result:
Saving 16% of construction budget and 17% in schedule.
project

Barabashovo market

Kharkiv city
Customer:
CONCERN AVEC AND CO
Role:
2017: technical audit of the shopping center. GBA: over 75 hectares. 2018-2019: survey of the capital costs of the shopping center with the formation of reports for financing organizations (banks).
Result:
2017: a large-scale audit was performed. 2018-2019: quarterly surveying of capital expenditures was carried out in accordance with the developed budget to eliminate the identified risks.
project

Multiplex сinema

Kyiv city
Customer:
Multiplex
Role:
Management of contract works during construction of cinema in Sky Mall shopping center.
Result:
Сonstruction of 10 cinema halls with full operational capability.
project

TIS

Odesa region
Customer:
TIS
Role:
Coordinating construction projects of railway defroster and “blue re-bar” warehouse.
Result:
2015-2017: the objects were put into operation according to the schedules and within the budget.
KEY Group in figures
0 years
in construction project management
$ 0
total cost of objects
0 m 2
GBA
0
total workers in completed projects
Our clients
client
client
client
client
client
client
client
client